C&C 33 mark ii Windstar

Welcome. This blog is intended to share and discuss upgrades and modifications to Windstar, my 1985 C&C 33 mk ii. please use the web view and browse the posts by type or date.

Boat Projects

  • Home
  • C&C 33 Mk ii parts cross reference
  • C&C 33 Mk ii Keel and Mast Step Work
  • Thoughts on the C&C 33 mark ii
  • 12V systems Upgrade
  • CL 11 Restoration

Wednesday, 10 March 2021

Spinnaker pics

 




Posted by Dave at 20:43 No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Labels

  • Acrylic Projects (9)
  • Belowdeck (16)
  • comfort and livability (27)
  • Deck and Cockpit (11)
  • Deck fills (1)
  • Electrical and Electronics (14)
  • Engine and Propulsion (4)
  • Fibreglass work (14)
  • galley (12)
  • Hull and Deck (11)
  • Maintenance and Winter Storage (2)
  • Open Source Computing (3)
  • Organization (14)
  • plumbing (5)
  • Repairs and upgrades (39)
  • Sails and Rigging (9)
  • Shock Cord Projects (2)
  • Solar and Batteries (5)
  • Systems and Safety (13)

All Posts

  • ►  2023 (1)
    • ►  April (1)
  • ►  2022 (4)
    • ►  October (4)
  • ▼  2021 (16)
    • ►  September (2)
    • ►  June (1)
    • ►  May (3)
    • ►  April (3)
    • ▼  March (1)
      • Spinnaker pics
    • ►  January (6)
  • ►  2020 (17)
    • ►  October (2)
    • ►  September (4)
    • ►  August (11)
  • ►  2019 (13)
    • ►  September (7)
    • ►  July (6)
  • ►  2018 (3)
    • ►  August (1)
    • ►  June (2)
  • ►  2017 (7)
    • ►  July (1)
    • ►  June (1)
    • ►  May (3)
    • ►  March (1)
    • ►  January (1)
  • ►  2016 (19)
    • ►  December (1)
    • ►  November (2)
    • ►  October (4)
    • ►  September (3)
    • ►  August (6)
    • ►  July (1)
    • ►  May (1)
    • ►  January (1)
  • ►  2015 (11)
    • ►  December (11)

Popular Posts

  • So, what's the problem? (Water in the keel stub - read on....)
    On haul out, Windstar would leak plenty plenty water from the keel/hull joint, even when the bilges were bone dry (which they usually ...
  • Starting this blog to document work on our '85 C&c33 mkii Windstar
    We purchased Windstar in 2014 after a 16-year hiatus from sailing.   I spent considerable time looking for a good boat;  good quality, well-...
  • Portlight Replacement
    Portlight Replacement Page Under construction - write up incomplete.     In the end I masked the hull, installed the windows caulked, tool...
  • Interior cushion replacement
    Windstar Cabin Upholstery Updated - Aug 27 2020 The project was completed by Premier Drapery and Upholstery in Whitby ON.  This is the sec...
  • Custom Cutlery drawer organizer in acrylic, material I had on hand.
    The arrangement and parts minimalization took a while to figure out, but I am happy with the result, especially given the drawer is located...
  • LED interior lighting
    Original fixture Have been grappling with the replacement of the OEM square fixtures in Windstar, and was having trouble finding LED rep...
  • Bomar Hatch Refurbishment
    2022 - deck hardware refresh and upgrades.   Hatches. Update March 2023 Am I unique in experiencing satisfaction from  carefully assembled, ...
  • Port side settee stowage access
    A 9600 lb racer-cruiser has limited stowage for even short cruises with more than 2 people. One of the things I dislike about the 33-2...
  • C&C 33ii Emergency Tiller Refinements
    C&C 33ii Emergency Tiller Refinements Update Stowage for the emergency tiller is documented here . Dealing with the tiller Ok, "ref...
  • Repair of keel/hull joint, closing unneeded thru hulls, and rudder
    Here are some modest sized examples of glass repair- closing two thru hulls, and repairing some small damage (and voids) at the keel/hull...

Search This Blog

Awesome Inc. theme. Powered by Blogger.